EAST TERRY STREET IMPROVEMENTS PROJECT

Join us for a Public Information Meeting

Thursday, August 15, 2024 from 4.p.m. to 6 p.m.
City Hall – Council Chambers
9101 Bonita Beach Road SE
Bonita Springs, FL 34135


Project Overview

The City of Bonita Springs is designing improvements for East Terry Street from Old 41 Road to Bonita Grande Drive. The purpose of this project is to improve the quality of life in Bonita Springs. The design will include improvements to stormwater structures, sidewalks, multi-use paths, and a roundabout at Morton Avenue. The City received a $16.8 million Community Development Block Grant as a part of the Mitigation Program for the design and construction of these improvements. The design is expected to be complete in summer 2025 and construction is expected to begin in winter 2025/26.


The improvements for this project will:

Provide:

  • Flood relief for isolated areas
  • Piped ditches along corridor
  • Improved cross drain capacity
  • Mitigated roadway resurfacing

Improve multimodal connectivity including:

  • Wider bicycle & pedestrian facilities
  • Safer road crossings
  • Safer intersections
  • Bicycle and pedestrian crossing over I-75


MULTIMODAL IMPROVEMENTS

Multimodal improvements are being designed that will include sidewalks and multi-use paths.

Before

 After

Before

 After


EAST TERRY STREET BRIDGE OVER I-75

Proposed improvements include multi-use path, reduce paved shoulders to 3’, and add aesthetic value.

 Existing Condition

 Proposed Condition


MORTON AVENUE INTERSECTION (PROPOSED ROUNDABOUT)

Due to high volume of eastbound (over I-75) rear end crashes, high turning movement volumes and high bicycle/pedestrian volumes at this intersection a roundabout is being proposed.


To view the project presentation click below.


To download the project presentation notes click below.


Para ver la presentación del proyecto haga clic a continuación.


Para descargar las notas de presentación del proyecto haga clic a continuación.

Get Connected

Here is how you sign up to receive information about the project!